Ashland NH

 

 

We service Ashland (NH) with Stamped Concrete, Epoxy Floor Coatings, Epoxy Garage Floors, Contractors Services. We have a large selection of colors and patterns! Give us a call for your next concrete project. We provide Free Estimates.

 

 

 

We Offer a large selection of Decorative Concrete Installation Service types:

    • Regular Concrete
    • Stamped Concrete
    • Polished Concrete
    • Acid Staining
    • Epoxy Garage Flooring
    • Epoxy Floor Coatings
    • Concrete Overlays
    • Micro Toppings
    • Grinding and Resurfacing
    • Custom Concrete Designs
    • Concrete Slabs of All types
    • Sandblasting Stenciled Designs
    • Stencil Concrete
    • Self Leveling
    • Patching
    • Epoxy Chip Coatings
    • Metallic Epoxy Coatings
    • Solid Color Epoxy Coatings
    • Self Leveling Epoxy Coatings
    • Mortar Epoxy Coatings
    • Epoxy Terrazzo Floor Coatings
    • Vapor Barrier Epoxy Coatings
    • 100% Solids Epoxy
    • Water-Based Epoxy Floor Coating
    • Solvent-Based Epoxy Floor Coating
    • Stamped Concrete Patios
    • Stamped Concrete Walkways
    • Stamped Concrete Pool Decks
    • Stamped Concrete Driveways

 

Stamped Concrete Ashland New Hampshire (NH)

If you want a concrete walkway, you can customize the design to suit your needs. It can be stamped or colored, lined with brick, or inlaid with stone. There are many ways to add a nice look to your home. This is a great option for homeowners who are concerned about safety. However, if you want to add a unique touch, you can go with a more expensive option. Here are a few ways you can make your walkway more attractive.

After preparing the base material for the concrete walkway, you should lay a layer of gravel on top. Then, you can use a curved screed board to slope your walkway to both sides. Using two x 4 pieces of wood with a spacer of 1/4″ on each end, the boards are placed on top of each other and fastened with 4″ wood screws. The curved screed board is used to screed the concrete and ensure an even finish.

The next step is to level the ground. You can either use a hand tamper or a mechanical compactor to compact the surface. The hand tamper should be held vertically and should not be inclined, as it will compromise the base. The same applies to a mechanical compactor. It is important to ensure that the form board is level and is not sagging. It is also important to have enough sand between the layers so that the surface can be smooth and level.

Once the base material is level, you can mix the liquid cement color with five quarts of clean water. After mixing the concrete color with the concrete, you should apply a concrete sealer to the surface. Once the color has set, you can fill the joints between sections of the walkway with sand or mortar mix. The final step is to place an isolation board on the walk that adjoins other buildings. It is important to note that if you have a neighboring building, it will help to place a release agent on the walk.

Upon completing the excavation process, lay down the concrete form on the ground. Then, make sure to place the gravel at the base of the concrete form so that it will not slide off. The finished surface should be sloping 1/4 inch per foot. It should also slope away from the house foundation and toward a location where water runoff will be most beneficial. This will prevent any kind of erosion or flooding of the concrete. It will also help protect the home from rust by preventing rot.

The next step is to prepare the base of the walkway by laying the reinforcing wire mesh on top of the gravel. The reinforcing wire mesh should be kept 1 to 2 inches from the edge of the concrete form. Then, lay the reinforcing wire mesh over the gravel. When placing the gravel, ensure that the wire mesh overlaps by about six inches. Then, you can attach the reinforcement wires with tie wires and support them with two-inch wire bolsters.

After placing the stones, a small pile of the jointing sand is placed in front of the board to make the walkway as level as possible. This sand will allow the concrete to set before you start using it. In some cases, this step may require a second step. The final step is to level the edges of the walkway. Then, you can use a hammer to break the stones into tiny pieces.

Once the base material has been laid, the next step is to apply jointing sand. After you have laid the sand, lay the form board over the string line. It is important to maintain the correct alignment of the form board, as it will affect the level of the concrete walkway. If you want a perfectly smooth concrete walkway, you can start with a small section of the walk and finish it with the rest of the materials.

Once the base material has been placed, you can continue with the process of scree ding the concrete. After the scree ding sand has been poured, the final step is to level the walkway. You must make sure that the finished walkway is level and that the gravel is properly anchored. Otherwise, the concrete will not stand up to the weight of the walk. You should also make sure that the area is well ventilated. When laying the forms, you should lay a small piece of gravel in front of it to ensure that the ground is not too hot.

 

 

Our Locations:

 

Nashua, NH

North Hampton, NH

Concord, NH